Method Statement for Segment Delivery and Transportation

1. INTRODUCTION 1.1 Purpose of the Document The purpose of this method statement is to define a procedure for the delivery and transportation of precast segments from Precast Yard to erection of the viaducts of HCMC Line1 – Metro Project in consideration of the following: - Delivery routes - Dimension and weight restrictions - Application of permit for related segments 1.2 Project Description Ho Chi Minh City Urban Railway Construction Project – Ben Thanh – Suoi Tien section (Line 1), Contract Package 2 consists of approximately 12 km long of elevated viaduct structures, erected by span-by-span method.

Method Statement for Segment Finishing Works

1. INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT The purpose of this procedure is to describe the procedure of operation concerning of the precast segment finishing works and ensure that all works will be conducted safely in accordance with the Project specifications. 1.2 PROJECT DESCRIPTION Ho Chi Minh City Urban Railway Construction Project – Ben Thanh – Suoi Tien section (Line 1), contract Package 2 consists of approximately 12 km long of elevated viaduct structures, erected by span-by-span Method.

Method Statement for Segment Lifting & Handling Works

1. INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT The purpose of this document is to describe the procedure of operation to be followed for the lifting of concrete precast segments, and ensure that all works will be conducted safely in accordance with the technical drawings, and the project specifications. 1.2 PROJECT DESCRIPTION Ho Chi Minh City Urban Railway Construction Project – Ben Thanh – Suoi Tien section (Line 1), contract Package 2 consists of approximately 12 km long of elevated viaduct structures, erected by span-by-span Method.

Method Statement for Segment Marking at Precasting Yard

1. INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT The purpose of this procedure is to describe the procedure regarding the marking of precast segments, prior to their transport to their erection location, and ensure that all works will be conducted safely in accordance with the drawings and the project specifications. 1.2 PROJECT DESCRIPTION Ho Chi Minh City Urban Railway Construction Project - Ben Thanh - Suoi Tien section (Line 1), contract Package consists of approximately 12 km long of elevated viaduct structures, erected by span-by-span Method.

Method Statement for Segment Storage & Stacking

1. INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT The purpose of this document is to describe the procedure of operation to be followed for the storage of concrete precast segments, and ensure that all works will be conducted safely in accordance with the technical drawings, and the project specifications. 1.2 PROJECT DESCRIPTION Ho Chi Minh City Urban Railway Construction Project – Ben Thanh – Suoi Tien section (Line 1), contract Package 2 consists of approximately 12 km long of elevated viaduct structures, erected by span-by-span Method.