Method Statement for General Pre-casting Works at Pre-casting Yard
		1. INTRODUCTION 1.1 PURPOSE OF THE DOCUMENT The purpose of this procedure is to outline General Arrangements, Construction Methodologies and other works all in accordance with the contract specification and details shown on the drawing, related to the pre-casting of segments composing the viaduct superstructure works of the HCMC Metro Project.
Where it is identified that there is a need to change the method of work due to unforeseen circumstances, then revision, authorisation and issue will follow the same procedure as the original.