method statement
Method Statement for Launching Gantry LG2 Assembly at Pier P10-04 & P10-05
Method Statement for Launching Gantry LG3 Assembly at Pier P13-17 & P13-18
Method Statement for Launching Girder LG1 Dismantling at SG4
Method Statement for Permanent Post Tensioning
According to the site conditions (temperature, humidity), the constituents of the grout have to be in good conditions during production and injection: • During grouting, the maximum grout temperature is limited to 32 °C. If necessary, water shall be chilled using ice cube. • Cement shall not be exposed to sunlight. It should not be younger than a week, and not older than 6 months. No lump shall be present inside the bag.