Technical LibraryMethod StatementsMethod StatementsConstruction methods and procedures. docs Technical LibraryDocument libraryDocuments in this sectionChoose a document to read the detailed procedure and technical guidance.21 Sep 2018General Erection Worksoutline General Arrangements, Construction Methodologies and other works related to the erection worksRead document -> 13 Sep 2018General Pre-casting Works at Pre-casting YardThe pre-casting of segments composing the viaduct superstructure works of the HCMC Metro Project.Read document -> 15 May 2015Casting Sequence - Long Line Typical Segmentdescribe the sequence of operation to be followed to precast typical segments of the typical straight spansRead document -> 15 May 2015Casting Sequence - Short Line Pier Segmentoutline the sequence of operations to be carried out for casting pier segment using the Short Line methodRead document -> 15 May 2015Casting Sequence - Short Line Typical Segmentdefine the sequence of operations to be carried out casting typical segments using the short line casting methodRead document -> 15 May 2015Curing of Segmentsdescribe the procedure of curing operation concerning of the precast segmentRead document -> 15 May 2015Precast Segment Remedial Worksdescribe the repairing procedure for all precast defects occurred during production & handling of segment in precasting yardRead document -> 15 May 2015Segment Concreting Works at Precasting Yarddescribe the procedure of operation for the concreting of precast segmentsRead document -> 15 May 2015Segment Delivery and Transportationdefine a procedure for the delivery and transportation of precast segments from Precast Yard to erection of the viaductsRead document -> 15 May 2015Segment Finishing Worksdescribe the procedure of operation concerning of the precast segment finishing worksRead document -> 15 May 2015Segment Lifting & Handling Worksdescribe the procedure of operation to be followed for the lifting of concrete precast segmentsRead document -> 15 May 2015Segment Marking at Precasting Yarddescribe the procedure regarding the marking of precast segments, prior to their transport to their erection locationRead document -> 15 May 2015Segment Storage & Stackingdescribe the procedure of operation to be followed for the storage of concrete precast segmentsRead document -> 30 Sep 2014Geometry Control Long Line Casting Methodoutline the sequence of operations to be carried out for geometry control of segments cast using the long line casting methodRead document -> 30 Sep 2014Post Tensioning Duct Fabricationdefine the equipment, materials and method for the fabrication of post tensioning ductRead document -> 30 Sep 2014Precast Segment Production Short Line Pier Moulddefine the sequence of operations to be carried out for the mould preparation & operation works of the Short Line Pier mouldRead document -> 30 Sep 2014Precast Segment Production Short Line Typical Moulddefine the sequence of operations to be carried out for the mould preparation & operation works of the Short Line Typical mouldRead document -> 30 Sep 2014Recast Segmentrecast the typical segment that need to be carried out on the Long Line and Short Line Typical MouldsRead document -> 07 May 2014Geometry Control Short Line MethodTechnical reference and reusable engineering guidance.Read document -> 07 May 2014Method Statement of Precast Segment Production Long Line Typical Mouldthe sequence of operations to be carried out for the mould preparation & operation works of the Long Line Typical mouldRead document -> 08 Mar 2014Rebar Cage Assemblythe method for rebar cage assembly works, including the installation of corrugated post-tensioning ductRead document -> 07 Mar 2014Rebar Cut & Bend WorksThe pre-casting of segments composing the viaduct superstructure works of the HCMC Metro Project.Read document -> 15 Jan 2014Closing Spandescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Finishing Works - Filling Inserts & Anchor Block Infilldescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Finishing Works for Filling Restrainer Bar Recessdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Installation of Front Support Tie Down barsdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Launching Backdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Launching Gantry LG1 Assembly at Pier P7-16 & P7-17describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Launching Gantry LG2 Assembly at Pier P10-04 & P10-05describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Launching Gantry LG3 Assembly at Pier P13-17 & P13-18describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Launching Girder LG1 Dismantling at SG4describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014LG2 Dismantling in VD13 (P13-14 to P13-17)describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014LG3 Dismantling in VD14 (P14-30 to P14-33)describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Launching Girder Load Testdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Refurbishment Plan of Launching Girderdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Typical LG Self-Launching over 30m Span Straightdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Typical LG Self-Launching over 35m Span Curveddescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Typical LG Self-Launching over 35m Span Straightdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Method statement for Typical LG Self-Launching over 37m Span Straightdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Permanent Post Tensioningdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Post Tensioning Friction Testdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Self-Launching through Stationsdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Shoring & Access Towers Assembly for LG1 Assembly at Pier P7-17describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Shoring & Access Towers Assembly for LG3 Assembly at Pier P13-17describe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Shoring and Access Towers Assembly for LG2 Assemblydescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Span Alignmentdescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014Typical Erectiondescribe the Erection procedure of a span by using the span by span methodRead document -> 15 Jan 2014U-Girder Service Load Testdescribe the Erection procedure of a span by using the span by span methodRead document ->